IPB

Welcome Guest ( Log In | Register )

Announcements
 
Reply to this topicStart new topic
Installation of a Ambi BCG Release.
post October 17th 2009 2:36 AM
Post #1


Hold My Beer and Watch This!
Group Icon

Group: Administrator
Member No.: 1
Posts: 26,518
Joined: Sep. 12th 2005
From: Blue Grass State by Heart, Currently Princeton IN.
Online Status: ONLINE






Today we are installing a Phase 5 Tactical Bolt Carrier Group Ambi Release the EBR V2.

First thing to be done is verify the weapon is unloaded and there is not a round in the chamber
.

Next we need is a test subject, I am installing this on another one of my LMT Lowers.



2nd thing make sure you have the proper roll pin punch to perform this task. I have chosen the Brownell's Bolt Catch Pin Punch "Slab Side"


The reason it is referred to the "Slab Side"



How to remove the roll pin from the Bolt Carrier Release.
1. Remove the Upper from the Lower.
2. Take the Slab Side Punch and place it correctly on the BCG Release Roll Pin.


Close Up of the Roll Pin.



Now Driving the Roll Pin Out.
Do not drive out the Roll Pin all the way, always leave it in the hole. Drive the roll pin out just enough to get the Factory BCG Release out.



Installation
Reverse the procedure above and this is what you have.

Part I am installing


Finished Installation


Top View of Finished Installation

Links and References to Other Pages:

http://www.brownells.com/.aspx...duct/BOLT_CATCH_PIN_PUNCH


Signature:
"A well regulated Militia, being necessary to the security of a free State, the right of the people to keep and bear Arms shall not be infringed."
Second Amendment to the US Constitution December 15th 1791
Go to the top of the pagePM
 
+Quote Post

Reply to this topicStart new topic

Active Members
1 User(s) are reading this topic (1 Guests and 0 Anonymous Users)
0 Members:
 


Information Center
RSS Lo-Fi Version Time is now: March 21st 2010 1:51 AM